Reno Diary #18: I Check Out the Chimney & Get Started on Electrical
Updated: 5 days ago
58 Days to Move-In

This post may contain affiliate links. If you purchase through these links, I may earn a small commission at no additional cost to you. I only recommend what I truly use and love.
I started my day by emailing the floor installer to thank him for spotting the asbestos and to tell him that the abatement was scheduled for Saturday, so we could proceed as planned with the floor installation.
I had a glimmer of hope that my first reno catastrophe would end happily.
I headed to the house to meet Rob, the master electrician, who would handle the bulk of the reno electrical work. After evaluating the hot mess that was my house, he'd work with the estimator to finalize the quote and send it to me that afternoon.
If all went well, Rob could start the job tomorrow.
Fingers crossed.
Planning the Electrical Work for My Home Renovation
I wanted the electrical work done first so the tradespeople who followed would have working outlets for their power tools. And there were going to be a lot of power tools.
Rob was a man of very few words. As we moved from room to room, I filled him in on how I planned to use each room, where the furniture would be placed, and where outlets would need to be added.
Rob occasionally nodded.
There was one moment of comedy in the bathroom. I pointed out a spot opposite the sink next to the toilet where I wanted an outlet added.
“Why?” said Rob, eyebrows raised.
“My Toto Washlet needs an outlet,” I said (with as much dignity as I could muster).
“OK,” he said. “Awesome.”
“It’s warm,” I said defensively.
“So I’ve heard,” said Rob, grinning.
The last room was the garage, where I wanted outlets added for my wine fridge and the refrigerator that came with the house (you know, the one with the ax marks).
“Anything else?” asked Rob, raising an eyebrow.
“Yes,” I said, pointing. “I need an outlet for my treadmill on this wall.”
Rob grinned again. “Of course you do.”
We walked out to his truck. Rob turned to me. “Not many people are as specific as you when they define a job. It’s really helpful—thank you.”
“You’re welcome,” I said, astounded.
“We’ll have a quote to you this afternoon. If you’re good with it, I can be back here tomorrow morning at 8 a.m.”
“Sounds like a plan,” I said.
After Rob left, I went into the kitchen to look at it without the original kitchen cabinets.
It was pretty ugly.

When I stepped into the space where the sink used to be, the subfloor gave way under my feet. I crouched down and put my hand on it.
The subfloor was wet and rotten. I could dig chunks out of it using my fingernails. I touched the moldy wallboard. It was damp and soft.
Yuck.
That explained why the water had been turned off at the sink.
At that moment Doug walked in to start his second day on the reno. The plan for today was for him to build the new stud wall over the interior concrete block wall. When that was finished, Doug was scheduled to paint all the ceilings a refreshing shade of sky blue.
But now we'd also need to remove the damp wallboard to find out whether the studs on the outside wall needed replacing. Judging from the moldy wallboard and rotten subfloor, they probably did.
I sighed. Another day, another disaster. I was glad I had built extra time into Doug’s schedule for contingencies like this.
Doug and I agreed that he would focus today on building the new stud wall as planned and rip out the old wallboard tomorrow. I left Doug building the new stud wall and looked in the garage. The old kitchen cabinets were piled in the center.
I reminded Doug that he needed to take the old cabinets to the dump, and went back to the condo to work for a few hours.
On the way home, I picked up the ceiling paint. I’d leave it in the car and drop it off at the house when I returned in the afternoon to meet the Chimney Guy.
While I was working, the electrical company emailed me their quote.
Everything on my list was included.
The timeline fit my schedule.
The total was within $500 of my estimate.
Win, win, win.
I called the scheduler, officially accepted the quote, and arranged for Rob to start at 8 a.m. tomorrow. First thing on the list was replacing the electrical panel in the garage. That would take roughly three days. The house would be without electricity for a few hours on Day 3 when they switched from the old panel to the new one.
Huzzah. That meant that the plumber and Doug would be able to use power tools if needed for the next two days. I would avoid scheduling any work needing them on Day 3.
I left the condo at 2:45, hoping to catch Doug at the house before his 3 p.m. quitting time, but he was gone when I got there. Happily, the studs were up.

The old cabinets were still piled in the center of the garage.
I sat in my dining room with my laptop and worked until 5, when Tony the Chimney Guy arrived.
He inspected the fireplace and confirmed what the home inspector had discovered—the fireplace interior had some cracks that would need to be repaired before lighting a fire. Fine with me—I am not a fan of burning wood.
Tony and I stood and looked at the fireplace.
Tony said, “Did that fireplace door come with the house? ‘Cause it’s a really high-quality one. You should keep it.”
“Thanks!” I said. “I will do that.”
After three days of reno and two disasters, I was due for a little bit of luck.

Next, we went outside to inspect the chimney. Tony used my ladder to climb onto the roof.
He walked to the chimney and slowly moved around it, looking intent.
I held my breath.
Tony straightened up, looked at me, and said, “There’s nothing wrong with this chimney.”
“What?” I said.
“There’s nothing wrong with this chimney.”
“Are you sure?” I said.
Tony looked down at me, eyebrows raised.
“It’s just that there is so much wrong with this house...” I said.
“Lady,” said Tony, “I SWEAR THERE IS NOTHING WRONG WITH THIS CHIMNEY.”
I sighed.
Tony climbed down, walked over, and smiled at me.
“Good luck with the rest of it,” he said.