Reno Diary #17: A Tsunami of Tradespeople—Managing Home Renovation Contractors
Updated: 5 days ago
59 Days to Move-In

This post may contain affiliate links. If you purchase through these links, I may earn a small commission at no additional cost to you. I only recommend what I truly use and love.
At 7 am on the dot I called the first asbestos abatement contractor on the list.
My call was answered on the second ring.
I explained the situation: finding asbestos in my home’s original linoleum mastic and needing to mitigate it while keeping an aggressive home renovation schedule.
“I want to save this house,” I said. “But I only have 60 days to do it.”
Brief silence. It seemed like forever.
“We can be out at lunchtime,” he said. “I’ll bring a tech with me who can take the samples to the lab and get them tested today.”
“Will Noon work?”
“Yes,” I said, stunned with gratitude.
“OK,” he said. “See you then.”
We hung up. The conversation had taken two minutes.
I drank a second cup of coffee and headed to the house.
No more planning. No more prep.
Today’s schedule included six trades’ appointments.
It was go time.
8 AM – Mold Mitigation, Electrical Estimate, Kitchen Demo
At 8 AM, several things happened simultaneously:
Peter The Mold Guy arrived to mitigate the mold in the attic.
The electrical estimator arrived to assess the electrical work needed for my house to support modern life.
Doug the handyman arrived to demo the original kitchen cabinets.
I pointed Peter to the attic entry in the garage. He got his ladder and equipment out of his van and disappeared into the attic.
Doug started methodically dismantling the metal kitchen cabinets.
The electrical estimator and I started in the garage at the breaker box.
I said, “I need your help to save this house.”
“Let’s do it,” he replied.
I quickly reviewed the major changes I wanted to make, including installing a new kitchen.
The estimator looked at the breaker box.
“Wow,” he said.
“I think it’s the original box from 1950,” I said.
He opened the panel door and squinted. “Did you say you are installing a new kitchen?”
“Yes,” I said.
“Then the first thing we need to do is replace this.”
“Put it on the list,” I said.
We then walked through the house. In the kitchen, he asked where the appliances would go. In the living room, he asked me where I would put the TV and the sofa. In the office, he asked me where I planned to place my desk and plug in my laptop.
He also asked me what type of fixtures I planned to use in place of all the Boob Lights.
He definitely had my number on those Boob Lights.
In 30 minutes, he helped me think through how I planned to actually live in my new home—and told me how his company could make that happen.
I had spent many hours thinking about the reno but not about my life post-reno. I resolved to make what happened when the reno was done part of my conversation with every tradesperson.
We shook hands. He promised me a quote by that afternoon.
I went to my car and pulled out the folding chair I had bought over the weekend to keep at the house. Back in the house, I heard Peter methodically moving through the attic and an occasional grunt from Doug as he wrested with the stubborn screws holding the kitchen cabinetry together.
I sat in the living room, drank the last of my coffee and responded to work email on my phone.
At 9 AM, Peter the Mold Guy emerged from the attic, smiling.
“All good,” he said.
I gave him a check and he drove off.
One down, 47 million reno tasks to go.
11 AM—A New Front Door
Dan, the installation supervisor from the Big Box Hardware Store where I bought my new front door, arrived promptly at 11 AM.
I had purchased a new condo back door from the same store a few years earlier, so I knew Dan and the drill.
Dan was a retiree that got bored and went back to work. His sole job was driving to customers’ homes, confirming their door replacement measurements, and finalizing their orders.
Dan loved his job. He loved driving around Portland. He loved schmoozing with customers. He loved re-measuring door openings. He loved getting paperwork signed.
In a crabby world still getting over the effects of the pandemic, Dan was a breath of fresh air.
He complimented me on my new home while looking askance at its peeling paint and rotting soffit and fascia. I assured him that both items were on the reno list to be fixed.
Because it was Dan, I actually pulled my reno execution schedule out of the accordion folder that went everywhere with me and showed him my plan.
Dan approved, and was thrilled to play his part in the reno.
I watched him retake the door measurements, signed the paperwork, and waved him good-bye.
My new door would arrive and be installed in early December. Which was fine—I could tolerate the existing colonial-style door and its ax marks for a few weeks after move-in.
Noon—The Asbestos Guys Arrive
Shortly before Noon, Doug finished dismantling the kitchen cabinets and left to grab lunch.
The house was empty—just in time to welcome the asbestos abatement people.
At Noon, they arrived—two burly guys in jeans and t-shirts.
The bigger and gruffer of the two handed me his card.
Owner and President of the company.
I had unknowingly hit the jackpot on that 7 am phone call.
“Let’s see this asbestos,” he said.
I walked them to the corner of the living room and lifted the carpet. They looked and simultaneously nodded.
“Yep,” said the owner. “That’s asbestos.”
He looked around. “My guess is that the linoleum in the kitchen is throughout the house under this carpet. We need to take samples in each room.”
“Tony here will run them to the lab when we leave. I’ve called them and they agreed to run the tests immediately so we know what we’re dealing with.”
Tony, jars and instruments in hand, pulled a sample from the living room corner and headed to the kitchen.
The owner continued. “I already reported the project to DEQ. If the tests are positive (and they will be), we can use today as the first day of the 5-day waiting period. I can have a crew here on Saturday at 8 AM to do the abatement.”
“Will that work?”
“Yes,” I whispered. “Thank you.”
The owner grinned.
“Hey,” he said. “We want you to save this nice little house. It’s going to be cool when you’re done.”
I had no words.
2 PM—Ceiling Paint and a New Garage Door
When Tony and his boss left, I made a quick trip to the paint store to pick up ceiling paint for one of Doug’s next tasks—painting every ceiling a pale sky blue.
I got back in time to hand the paint to Doug—who conveniently had to leave to take care of his kids after school.
A few minutes after Doug left, I welcomed the garage door representative whose job was similar to Dan’s, i.e., driving, schmoozing, measuring door openings, and getting paperwork signed.
He seemed to love his job, too.
30 minutes later, he was gone.
My new garage door and opener would arrive and be installed in early December. Until then, the garage would store renovation supplies, and I would tolerate the old door with its mysterious hole in the center.
I headed home, caught up on work items, and poured myself a glass of wine to celebrate an exhausting but successful day.
Glass in hand, I checked my personal email. There was one from the asbestos abatement company confirming asbestos in every room except the bathroom and confirming at 8 am start time on Saturday for the abatement.
I looked over my reno execution schedule. Getting the mitigation done on Saturday meant that nothing had to change in my reno schedule.
Sweet relief.
I had also received the electrical estimate. I made a few notes and hastily called to schedule a check-in at the house with the Master Electrician for the following day.
One Home Renovation Schedule Change
6 PM, and the first actual reno day had ended. Whew.
Then I remembered that I hadn’t yet scheduled one major task—replacing the gas furnace with a heat pump and integrated A/C.
Today had been a wild ride, with a lot packed into it.
I was pooped, and I had 60 days to go, most of them equally crammed with tasks.
Would it kill me to postpone this major reno line item?
I sat and thought. I currently had a working furnace. I wouldn’t need the A/C until next summer.
So, no, it wouldn’t kill me. It would give me a substantial breather instead.
And, after today, I realized that I needed all the breathers I could get.
I decided to officially postpone the heat pump install until Spring.
To make it real, I updated my spreadsheet.
It was crazy how much better it made me feel. So much so that I was looking forward to tomorrow.